METROHUB 3
Metrohub 3 is the fourth Grade-A industrial and logistics development in E-Metro Logistics Park, spanning approximately 0.8 million sq. ft. This state-of-the-art, two-storey ready-built warehouse facility features two distinct blocks: Block 1, designed with future capacity for Dangerous Goods (DG) storage, and Block 2, dedicated to general warehousing.
DEVELOPMENT FEATURES
2-storey ready-built logistics facility with future DG capability
Designed to be ESG-compliant (proposed LEED Gold certification)
Easy access from NKVE, Federal Highway and WCE
Target completion in Q3 2027
399
Car Parking Lots
471
Motorcycle Parking Lots
4
OKU Parking Lots
10
EV Parking Lots
Q1 2026
Construction Commencement
2.3MW
Power Provision
NATURAL
Ventilation
NFPA & PBA
Firefighting System
LEED GOLD
Green Certification
Q3 2027
Expected Completion
Metrohub 3 (Level 1)
LEGEND









Metrohub 3 (Level 2)
LEGEND




