Metrohub 3 is the fourth Grade-A industrial and logistics development in E-Metro Logistics Park, spanning approximately 0.8 million sq. ft. This state-of-the-art, two-storey ready-built warehouse facility features two distinct blocks: Block 1, designed with future capacity for Dangerous Goods (DG) storage, and Block 2, dedicated to general warehousing.

DEVELOPMENT FEATURES

2-storey ready-built logistics facility with future DG capability

Designed to be ESG-compliant (proposed LEED Gold certification)

Easy access from NKVE, Federal Highway and WCE

Target completion in Q3 2027

Design flexibility for subdivision of space & expansion (In configurations of approx. 100,000 sq.ft.)

Clear racking height – Level 1 (11.75m) & Level 2 (10.6m to 11.75m)

Floor Loading – Level 1 (3tonne/m2 ) & Level 2 (2.5tonne/m2 )

Columns grid – 12m x 12m (Level 1 & 2)

Ramp designed with headroom clearance of 4.75m

2.3MW Power Provision

Ample carpark spaces

Columns grid – 12m x 12m (Level 1 & 2)

Advanced fire fighting provisions - NFPA standards, ESFR sprinkler system

Multi-tiered security (CCTV & patrols)

Q1 2026

Construction
Commencement

Q3 2027

Expected Completion

Metrohub 3 (Level 1)

Block 1 : 2-Storey Ready-Built-Warehouse (RBW) with provision for Dangerous Goods (DG) storage
Block 2 : 2-Storey Ready-Built-Warehouse (RBW) Facility Complete with Ancillary Buildings
LEGEND
Asset 3@2x
Heavy Vehicle Entrance/Exit
Asset 4@2x
Guard House
Asset 5@2x
Cafeteria/Facilities Management
Asset 6@2x
Ramp
Asset 2@2x (2)
TNB Substation
Logistic Path
Light Vehicle Path
Emergency Exit
Ramp Access

Metrohub 3 (Level 2)

Block 1 : 2-Storey Ready-Built-Warehouse (RBW) with provision for Dangerous Goods (DG) storage
Block 2 : 2-Storey Ready-Built-Warehouse (RBW) Facility Complete with Ancillary Buildings
LEGEND
Logistic Path
Light Vehicle Path
Emergency Exit
Ramp Access